Split-Level Kitchen Remodel: Layout Ideas for Split-Level and Split-Foyer Homes

If you own a split-level in the Des Moines suburbs, you probably know the feeling. The kitchen sits half a flight up from the front door, closed off behind a wall, and whoever is cooking can hear the family but can’t see them.

Most of these homes went up in the 1960s and 1970s, when the kitchen was meant to be its own room. The good news is that split-level kitchens are some of the most rewarding to open up. The layout usually gives you more options than it first appears, as long as you know which walls you’re dealing with and what’s inside them.

First, Which Kind of Split-Level Do You Have?

People use “split-level” for a few different house types, and the kitchen sits in a different spot in each. That changes what’s possible.

House typeWhat it looks likeWhere the kitchen usually isWhat it means for a remodel
Split-level or tri-levelThree or more short levels joined by half flights of stairsOn the main level, beside the living room and above the lower family roomThe wall between the kitchen and living room is the usual target. It often needs a beam to remove, but the payoff is a clear view across the main floor.
Split-foyer (split entry or bi-level)The front door opens onto a landing, with one flight up and one flight downUpstairs, usually at the back next to the dining areaThe kitchen is already on the main living floor, so the walls between kitchen, dining and living room are often the easiest to rework. The open stairwell limits where an island can go.
Back-split or side-splitLevels stagger from front to back or from side to sideUsually on the main levelWorks much like a tri-level, though the kitchen may share a wall with a stairwell, which shapes the layout.

Common Split-Level Kitchen Problems and How They Get Solved

Most of the split-level kitchens we see share the same handful of issues. Here’s how each one is usually fixed, and what tends to make the fix bigger than expected.

The problemThe usual fixWhat makes it harder
A full wall between the kitchen and living roomRemove all or part of the wall and carry the load on a new beamIf the wall is load-bearing, the beam has to be sized and supported all the way down to the foundation. A beam tucked up inside the ceiling looks cleanest but takes more work than one that drops below it.
A narrow galley kitchenTake out one side of the galley and replace it with a peninsula or islandPlumbing or a gas line on the wall that comes out has to be rerouted.
A half wall over the stairs that blocks the viewSwap the half wall for an open railing, or turn the layout so the sink or island faces the stairsThe new railing has to meet code for height and spacing.
Not enough counter or storage spaceRework the cabinet layout or borrow space from the dining areaMoving a sink or range far from where it sits now means longer plumbing or venting runs.
A dark kitchen with one small windowOpen sightlines to the living room windows, or add a larger windowRaising or vaulting the ceiling depends on how the roof is framed. Roof trusses usually can’t be changed without an engineer.

Ductwork is the surprise in a lot of split-levels. Heat runs often travel up through the wall between the kitchen and living room on their way to the bedrooms, so opening that wall means rerouting them. A good plan finds those runs before anyone picks a countertop.

Open Concept Doesn’t Have to Mean No Walls

Taking out every wall isn’t always the best answer, even when it’s possible. Some split-level owners want to see the living room from the stove but still keep the dishes out of view from the front door. A few middle-ground options:

  • Partial wall removal. Open the end of the wall closest to the living room and leave a short section for cabinets or a fridge.
  • A peninsula with seating. It marks where the kitchen ends without blocking the view.
  • A wide pass-through. A large opening with a counter keeps the kitchen defined but lets light and conversation through.

Keeping the Mid-Century Character

Updating the kitchen doesn’t mean erasing what makes the house feel like itself. Custom trim and cabinetry can match the original millwork or give it a modern edge, and natural wood or stone keeps a new kitchen from looking out of place. If there’s a stair rail or a built-in hutch worth keeping, the design can work around it. Our post on custom trim carpentry shows what that can look like.

How Long a Split-Level Kitchen Remodel Takes

Because most split-level kitchen projects move or open a wall, they usually fall into the major remodel category. Plan on about 2 to 3 months of design and planning and 12 to 16 weeks of construction. A remodel that keeps the same layout moves faster. Our guide to how long a kitchen remodel takes walks through each phase, and it’s worth planning a temporary kitchen setup on another level while the work is underway.

Related Reading

If you’re looking at your own split-level kitchen and wondering which wall can go, a walkthrough is the fastest way to find out. You can book a design consultation, and we’ll look at the structure and how your family uses the space before talking about finishes.

Split-Level Kitchen FAQs

Can you remove walls in a split-level home?

Often, yes. The first step is finding out whether the wall is load-bearing and what runs through it. A load-bearing wall can usually come out with a properly sized beam and posts that carry the weight down to the foundation, and any ductwork, plumbing or wiring inside it gets rerouted.

What’s the difference between a split-level and a split-foyer?

A split-level has three or more staggered levels connected by short flights of stairs. A split-foyer, also called a split entry or bi-level, has two main levels, and the front door opens onto a landing between them.

Can I see design options before construction starts?

Yes. We can show you layout options and finish ideas before construction begins, so you can compare a few versions of the kitchen side by side.

Will the new kitchen match the rest of my home?

It can. Trim, flooring and finishes can be matched to the rest of the house or carried through from the kitchen, so the new space doesn’t look like an add-on.

How long does a split-level kitchen remodel take?

Most involve a layout change, so plan on about 2 to 3 months of design and planning and 12 to 16 weeks of construction. A remodel that keeps the same layout moves faster.

Related Blog Posts

Aging-in-Place Remodeling Ideas for Central Iowa Homes
Most people want the house they already have to keep working. Here's a room-by-room look at the entry, bathroom, kitchen, and stairs in Central Iowa homes, and what to build in now so it's easier to add the rest later.
How Much Does It Cost to Finish a Basement in Iowa?
Wondering how much it costs to finish a basement in Iowa? Learn what affects basement finishing cost, from bathrooms and egress windows to layout and finishes.
Whole-Home Renovation in Des Moines: What a Full Home Remodel Involves
Planning to update most of the house at once? See what a whole-home renovation usually involves for your kind of Des Moines home, how the budget gets built, and how to plan the work so it goes smoothly.